🚆 Azadpur to South Extension Delhi Metro route details are given below, please scroll down.
Total Stations 🚉 | 18 |
Fare ⟨₹⟩ | 40 |
Travel Time ⏰ | 37 min. |
First Train | 5:37 |
Last Train | 0:15 |
Route from Azadpur to South Extension is a part of the Delhi Metro network, which passes through 18 stations. The total travel time for passengers from Azadpur to South Extension is approx 37 minutes.
A ticket will set you back 40 rupees, but if you've got a smartcard, you might save a little. Always nice to get a discount! The metro runs from early morning to late night. First train leaves at 5:37 AM, and the last one's at 0:15 at night. So you've got options all day long.
Azadpur Metro Station Details |
|
Phone No | 7290052072, 8800793123 |
First Train | 5:37 |
Last Train | 0:15 |
Azadpur Metro Station Entry/Exit Gate | |
Gate No 1 | Mahendru Enclave, Model Town- III |
Gate No 2 | Not Operational |
Gate No 3 | Azadpur GT Road, Azadpur Railway Stn. Lal bagh |
Gate No 4 | Municipal colony, Model town-3, Chatrasaal Stdm. |
South Extension Metro Station Details |
|
Phone No 📞 | 7290069415, 9667396689 |
First Train | 6:19 |
Last Train | 22:58 |
South Extension Metro Station Entry/Exit Gate | |
Gate No 1 | East Kidwai Nagar, NBCC Flats, Kale Khan Ka Makbara |
Gate No 2 | South Extension Part-1 Market, South Extension Part-1 (Block C,D,E,G,H,N) |
Gate No 3 | South Extension Part-2 Market, South Extension Part-2 (Block E,D,L,M) |
Gate No 4 | South Extension Part-2 Market, AIIMS Campus, National Medical Library |
FAQ's
▣ How many interchange in this route
This route includes 1 interchange station where you can easily switch trains to reach your destination.
▣ How long does it take to travel from Azadpur to South Extension by metro?
It takes approximately 37 minutes to travel from from Azadpur to South Extension on the Delhi Metro.
▣ How much does it cost to travel from Azadpur to South Extension?
The metro fare from Azadpur to South Extension is ₹40 if you’re using a token. With a metro card, you might get a small discount.
▣ What time does the first metro from Azadpur to South Extension start?
The first metro from Azadpur usually starts around 5:37 AM, but it’s may be change during any special day.
▣ How many stops are there between Azadpur to South Extension?
There are 18 stations in total between Azadpur to South Extension on this metro route.
▣ What are the timings of the first and last metro from Azadpur to South Extension?
The first metro from Azadpur heading towards South Extension starts at 5:37 AM, and the last one leaves at 22:58 at night. These timings are based on the schedule from Azadpur