🚆 Sector-42-43 Gurgaon to South Extension Delhi Metro route details are given below, please scroll down.
Total Stations 🚉 | 16 |
Fare ⟨₹⟩ | 40 |
Travel Time ⏰ | 39 min. |
First Train | 6:06 |
Last Train | 22:06 |
Route from Sector-42-43 Gurgaon to South Extension is a part of the Delhi Metro network, which passes through 16 stations. The total travel time for passengers from Sector-42-43 Gurgaon to South Extension is approx 39 minutes.
A ticket will set you back 40 rupees, but if you've got a smartcard, you might save a little. Always nice to get a discount! The metro runs from early morning to late night. First train leaves at 6:06 AM, and the last one's at 22:06 at night. So you've got options all day long.
Sector-42-43 Gurgaon Metro Station Details |
|
Phone No | 91-120-2210603, 1800-1800-250 |
First Train | 6:06 |
Last Train | 22:06 |
Sector-42-43 Gurgaon Metro Station Entry/Exit Gate | |
Gate No 1 | Sector 42-43 |
South Extension Metro Station Details |
|
Phone No 📞 | 7290069415, 9667396689 |
First Train | 6:19 |
Last Train | 22:58 |
South Extension Metro Station Entry/Exit Gate | |
Gate No 1 | East Kidwai Nagar, NBCC Flats, Kale Khan Ka Makbara |
Gate No 2 | South Extension Part-1 Market, South Extension Part-1 (Block C,D,E,G,H,N) |
Gate No 3 | South Extension Part-2 Market, South Extension Part-2 (Block E,D,L,M) |
Gate No 4 | South Extension Part-2 Market, AIIMS Campus, National Medical Library |
FAQ's
▣ How many interchange in this route
This route includes 2 interchange station where you can easily switch trains to reach your destination.
▣ How long does it take to travel from Sector-42-43 Gurgaon to South Extension by metro?
It takes approximately 39 minutes to travel from from Sector-42-43 Gurgaon to South Extension on the Delhi Metro.
▣ How much does it cost to travel from Sector-42-43 Gurgaon to South Extension?
The metro fare from Sector-42-43 Gurgaon to South Extension is ₹40 if you’re using a token. With a metro card, you might get a small discount.
▣ What time does the first metro from Sector-42-43 Gurgaon to South Extension start?
The first metro from Sector-42-43 Gurgaon usually starts around 6:06 AM, but it’s may be change during any special day.
▣ How many stops are there between Sector-42-43 Gurgaon to South Extension?
There are 16 stations in total between Sector-42-43 Gurgaon to South Extension on this metro route.
▣ What are the timings of the first and last metro from Sector-42-43 Gurgaon to South Extension?
The first metro from Sector-42-43 Gurgaon heading towards South Extension starts at 6:06 AM, and the last one leaves at 22:58 at night. These timings are based on the schedule from Sector-42-43 Gurgaon