Jor Bagh to South Extension -DMRC Route

🚆 Jor Bagh to South Extension Delhi Metro route details are given below, please scroll down.

Total Stations 🚉 3
Fare ⟨₹⟩ 20
Travel Time ⏰ 6 min.
First Train 5:35
Last Train 23:35
1
  Jor Bagh  
Change at Dilli Haat - INA ⇌ Pink Line

Route from Jor Bagh to South Extension is a part of the Delhi Metro network, which passes through 3 stations. The total travel time for passengers from Jor Bagh to South Extension is approx 6 minutes.

A ticket will set you back 20 rupees, but if you've got a smartcard, you might save a little. Always nice to get a discount! The metro runs from early morning to late night. First train leaves at 5:35 AM, and the last one's at 23:35 at night. So you've got options all day long.

Jor Bagh Metro Station Details

Phone No 7290024758, 8800793138
First Train 5:35
Last Train 23:35
Jor Bagh Metro Station Entry/Exit Gate
Gate No 1Fire Station Safdarjung
Gate No 2Rajiv Gandhi Bhawan
Gate No 3Safdarjung Airport office complex

South Extension Metro Station Details

Phone No 📞 7290069415, 9667396689
First Train 6:19
Last Train 22:58
South Extension Metro Station Entry/Exit Gate
Gate No 1East Kidwai Nagar, NBCC Flats, Kale Khan Ka Makbara
Gate No 2South Extension Part-1 Market, South Extension Part-1 (Block C,D,E,G,H,N)
Gate No 3South Extension Part-2 Market, South Extension Part-2 (Block E,D,L,M)
Gate No 4South Extension Part-2 Market, AIIMS Campus, National Medical Library

FAQ's

How many interchange in this route

This route includes 1 interchange station where you can easily switch trains to reach your destination.

How long does it take to travel from Jor Bagh to South Extension by metro?

It takes approximately 6 minutes to travel from from Jor Bagh to South Extension on the Delhi Metro.

How much does it cost to travel from Jor Bagh to South Extension?

The metro fare from Jor Bagh to South Extension is ₹20 if you’re using a token. With a metro card, you might get a small discount.

What time does the first metro from Jor Bagh to South Extension start?

The first metro from Jor Bagh usually starts around 5:35 AM, but it’s may be change during any special day.

How many stops are there between Jor Bagh to South Extension?

There are 3 stations in total between Jor Bagh to South Extension on this metro route.

What are the timings of the first and last metro from Jor Bagh to South Extension?

The first metro from Jor Bagh heading towards South Extension starts at 5:35 AM, and the last one leaves at 22:58 at night. These timings are based on the schedule from Jor Bagh

Scroll to Top